Re: [問題] 高應100成會考題

看板Accounting (會計)作者 (joysanchis)時間14年前 (2011/10/12 02:20), 編輯推噓1(101)
留言2則, 2人參與, 最新討論串2/2 (看更多)
※ 引述《acer801 (acer801)》之銘言: : Springfield Sign Shop manufactures only specific orders. It uses a standard : cost system. During one large order for the airport authority, an unusual number of : signs were spoiled. The normal spoilage rate is 10% of units started. The : point of first inspection is half way through the process, the second is : three-fourths through the process, and the final inspection is at the end of the process. : Other information about the job is as follows: : Signs started 3,000 : Signs spoiled 450 : Direct materials put into process at beginning $ 60,000 : Conversion costs for job $120,000 : Standard direct material costs per sign $27 : Standard conversion cost per sign $54 : Average point of spoilage is the 3/4 completion point : Average current disposal cost per spoiled sign : Make necessary journal entries to record all spoilage. (8分) : 請問這題要怎麼解阿, : 是不是分步阿 : 說要寫損壞品調整分錄 : 有高手可以解答 ㄜ說說我的算法好了 不過我不敢確定是對的Orz 總損壞450件 正常損壞是10%本期投入=300件 非常損壞則=150件 然後因為是標準成本制 所以就直接用標準成本來看 正常損壞的300件 DM假設是一開始就投入 加工成本平均投入 損壞品的平均完工程度75% 所以正常損壞300件的金額是300*27+300*54*75%=20,250 我去看了一下原題 他說殘值是$15 然後因為是特定批次產生的正常損壞 所以歸屬到特定批次 分錄 損壞品 4,500 WIP-XXX批次 4,500 接下來非常損壞150件 分錄 損壞品 2,250 非常損失 7,875 WIP-XXX批次 10,125 -------------------------------------------------------------------------- 我的想法是這樣 有錯的話歡迎大家一起討論 因為我也沒看過這種題型0.0 -- ※ 發信站: 批踢踢實業坊(ptt.cc) ◆ From: 122.118.36.66

10/12 19:28, , 1F
謝謝大大解答
10/12 19:28, 1F

10/12 23:32, , 2F
婀 解答是跟這一樣嗎?
10/12 23:32, 2F
※ 編輯: joysanchis 來自: 122.118.44.158 (10/12 23:42)
文章代碼(AID): #1Eb8ZoG6 (Accounting)
討論串 (同標題文章)
文章代碼(AID): #1Eb8ZoG6 (Accounting)