[News] Indian moon mission's landing module s已刪文

看板EngTalk (全英文聊天)作者 (n/a)時間5年前 (2019/09/02 18:05), 編輯推噓0(000)
留言0則, 0人參與, 最新討論串1/1
India's space agency says the landing module of the country's unmanned moon mission has separated from the orbiter ahead of its planned touchdown on the moon's south polar region this weekend. The Indian Space Research Organization says all the systems of orbiter and the lander are "healthy." Monday's maneuver removed the lander from the orbiter's top, where it had been sitting since the mission took off on July 22. The module will attempt India'sirst moon landingn a relatively flat surface on Saturday to study previously discovered water deposits. The roughly $140 million mission is known as Chandrayaan-2, the Sanskrit word for "moon craft." Chandrayaan-1 orbited the moon in 2008 and helped confirm the presence of water. India plans to send humans into space by 2022. ----- Sent from JPTT on my Htc HTC Desire 12+. -- ※ 發信站: 批踢踢實業坊(ptt.cc), 來自: 101.14.192.129 (臺灣) ※ 文章網址: https://www.ptt.cc/bbs/EngTalk/M.1567418749.A.AE3.html
文章代碼(AID): #1TREbzhZ (EngTalk)
文章代碼(AID): #1TREbzhZ (EngTalk)