[英中] 詢問該文章中文翻譯內容為何?
The Contractor’s Project Manager and the Purchaser’s designated Job Site
Representative will create a plus/minus list of additional services or cost
occurred that are outside of the scope of the original contract. The list
will be updated on an “as required” basis and will include a description of
the particular item, the party that will do the work, an estimated cost of
the work, and name the “Purchaser”, the Contractor”, or “to be determined
” as the party responsible for the costs incurred.
--
※ 發信站: 批踢踢實業坊(ptt.cc), 來自: 113.175.144.26
※ 文章網址: https://www.ptt.cc/bbs/Translation/M.1442427845.A.3ED.html
→
09/17 14:23, , 1F
09/17 14:23, 1F
討論串 (同標題文章)
以下文章回應了本文 (最舊先):
完整討論串 (本文為第 1 之 3 篇):
Translation 近期熱門文章
PTT職涯區 即時熱門文章